Select Water Well Projects
Marygold Mutual Water Company Well No. 6 Equipping and Disinfection
Steven Andrews Engineering was retained by Marygold Mutual Water Company to design a new 2,500 gpm domestic water well. The project is located in the City of Bloomington, CA on Company property. Steven Andrews Engineering prepared construction plans and specifications and assisted with the permitting process. The design included the equipping and installation of a 2,500 gpm pump, 500 HP motor, disinfection facilities, block building to match the existing office building architecture and appurtenances to replace an existing well that serves the domestic water system. Previously, Steven Andrews Engineering prepared plans and specifications and managed the construction of Well No. 6 drilling and development that was performed in 2005.
Walnut Park Mutual Water Company Well No. 12 Equipping and Disinfection
Steven Andrews Engineering was obtained by Walnut Park Mutual Water Company to design a new 4,000 gpm domestic water well. The project is located in the City of Huntington Park, CA on company property. Steven Andrews Engineering prepared construction plans and specifications for a new domestic water well designated as Well No. 12. The design involved the equipping and installation of a 4,000 gpm vertical turbine pump, 400 hp vertical hollow shaft motor with variable frequency speed drive, block building with sound paneling Alpro Acoustical System, HVAC System, chlorination room and appurtenances to replace an existing well that serves the domestic water system. Steven Andrews Engineering also managed the construction phase of the well equipping and permitting. Steven Andrews Engineering was also part of the well drilling and development project previously drilled and developed in 2008.
City of Chino Well No. 16 Equipping
Steven Andrews Engineering was retained by Lewis Management Corporation to design a new 800 gpm domestic water well to work in conjunction with an onsite water treatment facility. The project is located in and old dairy farm in the City of Ontario, CA, that has been re-zoned for industrial use and is part of a greater project. Steven Andrews Engineering staff prepared construction plans and specifications for the new domestic well designated as Well No. 16 by the City of Chino for the Preserve Development. The newly drilled and developed domestic water well was equipped with an new 800 gpm pump and 250 horse power electric motor. Steven Andrews Engineering staff also managed the construction phase of the Well No. 16 drilling and development.
Additional Water Well Projects
-
- Yuima Municipal Water District – Construction of IDA Well No 51 Pilot Hole
- Yuima Municipal Water District – Construction of IDA Well No 52 Pilot Hole
- City of Chino – Well No. 17 Drilling and Development
- Tejon Ranch Company – Tejon Ranch Domestic Water well
- City of Fountain Valley – Well No. 10 and Well No. 11
- City of Compton – Pumping Facilities for Well No. 18
- Trabuco Canyon Water District – Schwendeman Well